design build

Power Distribution Expansion

Installed a new 20 megawatt power plant and substation along with control equipment, vacuum breakers, air switches, switching pedestals, terminations, transformers and interconnection of synchronized generators

Replace Feeder K1

Replaced a 5.5 mile portion of overhead electrical line, Feeder K1, needed to support Vandenberg AFB's space launch mission and ensure adequate security

Replace Overhead Distribution

Performed the demolition, installation and connection of overhead utility lines on the N5/N9/N10 feeder at Vandenberg AFB