Power Distribution Expansion
Installed a new 20 megawatt power plant and substation along with control equipment, vacuum breakers, air switches, switching pedestals, terminations, transformers and interconnection of synchronized generators
Installed a new 20 megawatt power plant and substation along with control equipment, vacuum breakers, air switches, switching pedestals, terminations, transformers and interconnection of synchronized generators
Replaced a 5.5 mile portion of overhead electrical line, Feeder K1, needed to support Vandenberg AFB's space launch mission and ensure adequate security
Performed the demolition, installation and connection of overhead utility lines on the N5/N9/N10 feeder at Vandenberg AFB